Weaver General Construction Co.
 
  Home | About us | Projects | Bidding | References | Contact Us
 

 

 
 

 

Town of Eagle

Upper Basin Water Treatment Plant Expansion

 

 
 
Project Manager:
Chief Estimator:
Superintendent:

 

     
 
Specifications    
  Division 1 Division 9    
  Division 13    
  Division 15 Division 16    
  Appendix A      
         
         
Drawings:    
     
       
         
         
Addendum:      
         
         
     
 

Soils Report:

     
 
     

 

     
 
Other
     
 
Pictures
     
         
         
© 2008 Weaver General Construction Co. (303) 789-4111 weaver@weavergc.com