![]() |
Weaver General Construction Co. 3679 SouthHuron St., Suite 404 Englewood, Colorado 80110 (303) 789-4111 Fax (303) 789-4310 |
||||||||||||||
Harold D. Thompson Regional Water Reclamation Facility - Phase1 Lower Fountain Metropolotan Sewage Disposal District |
|||||||||||||||
We are solicating SEPERATE quotations for the fence and the concrete work for this project. Please review Division 1, 2 and 3 , and under drawings, Concrete & Fence Bid, in preparing your bids. See specification section 02840 and the drawings for the scope of the required barb wire fence. The concrete work consists of the work at the Digesters, Aeration Basins and Drilled Piers, ONLY. Your quote should EXCLUDE cassion drilling, rebar materials, earthwork, soils engineering and testing. We are anticipating to start the work in the summer of 2010 and the project is tax exempt. All questions should be in writing and emailed to john@weavergc.com. The cutoff for questions is Please email your quotes to bruce@weavergc.com or fax to (303) 789-4310, on or before July 2, 2010, at 2:00 PM.
Please email questions to Bruce |
|||||||||||||||
| Specifications: | Drawings: | Addendums: | |||||||||||||
© 1985-2010 Weaver General Construction Co. (303) 789-4111 |
|||||||||||||||